Less detours cabinet purchase design process

2022-07-22
  • Detail

The kitchen cabinet is the soul of the whole kitchen. It needs to cooperate with water, electricity, ceiling and other projects. Many processes run through it, so it will make the decoration novice confused. And the utilization rate of cabinet is very high, so its design and quality are also very important. However, many owners do not understand the design process of cabinet purchase, which leads to insufficient communication, detours in construction, waste of budget, etc., so today we will briefly talk about the design process of cabinet purchase

cabinet is the soul of the whole kitchen. It needs to cooperate with water, electricity, ceiling and other projects. Many processes run through it, so it will make the decoration novice confused. And the utilization rate of cabinet is very high, so its design and quality are also very important. However, many owners do not understand the design process of cabinet purchase, which leads to insufficient communication, detours in construction, waste of budget, etc., so today we will briefly talk about the design process of cabinet purchase

I. select cabinets before decoration

choose the brand, decide the style and materials you like, and discuss the price. After specifying the order intention, you must pay a certain measurement deposit and make an appointment for the preliminary test

editor's note: you must consider clearly before the preliminary test, because generally, after the preliminary test, the deposit is not refundable, but when signing the contract, the deposit can be deducted from the total price

II. After the construction team enters the site, the cabinet designer comes to the door for preliminary test

the water circuit construction can only be started after the cabinet scheme is confirmed. After the construction team entered the site, it was about the first door-to-door preliminary measurement of the cabinet design. When the cabinet designer measured the size, what requirements should be explained clearly in person, including the specification and size of the range hood, stove, refrigerator, disinfection cabinet and other electrical appliances. The more detailed the explanation, the closer the cabinet is to your actual needs

editor's reminder: during the preliminary test, the water and electricity workers, cabinet designers and owners need to be present to negotiate and communicate together: determine the structure of the cabinet, the location of the power supply and the approximate location of electrical appliances

III. designers issue drawings

designers generally complete the overall scheme of the cabinet within 3 days and inform customers to see the scheme. The more formal the business is, the more standardized the drawings are. If you have any objection to the scheme, communicate and revise with the designer. There is no problem after the designer's modification, and the water and electricity transformation drawing is issued

editor's reminder: you must understand the scheme drawings and ask clearly what you can't understand. Don't fool yourself and cause regret in the future

tips: design principles

side dish area: it is absolutely necessary to maintain a distance of 80mm between the sink and the stove, and 100mm is better. This is the central point of the kitchen: fish, meat, vegetables, etc. are all ready here. The cooking utensils and condiments needed should be placed at hand

washing area: the most common combination of sink and drain board cabinet is: the two sinks are 340 mm and 293 mm wide respectively, and are installed on an 800 mm wide floor cabinet. Next to the sink should be the wall cabinet for storing cups, seasoning boxes, glassware and plates; Wall cabinet for storing cooking utensils such as clean dishes; Drawers for storing cooking utensils, knives and forks, etc; The floor cabinet under the sink for storing decontamination powder, detergent or other chemical cleaning agents is also the best place for the built-in garbage can. Because children can open this cabinet, it is wise to lock the floor cabinet

lighting: it is more important to install a lamp with appropriate light in a proper position than a lamp with high wattage. The daylighting of the worktable area should come from the kitchen ceiling lamp and the lamp installed in the front end under the wall cabinet. The important point is that the light is not reflective on the worktable. Use a cover similar to the curtain box under the closet to properly block the eyes from direct light

line of sight: the wall cabinet, range hood or shading box should not block the user's line of sight, so that he can't see the things behind the table. It is very important to keep enough distance between the workbench and the bottom of the wall cabinet. 50 cm is generally enough

take height: commonly used cooking utensils should be placed at an accessible place. The lifting height should be set at the height reached by the user without any steps under his feet after the hand is extended. The height of the highest layer of the closet that a person with a height of 165 cm can touch is about 190 cm. Elderly people have difficulty bending and squatting. The pull-out laminate or basket can make it easy for them to pick up and put things. Those who can only work in a sitting position have more restrictions, so the kitchen storage space designed for wheelchair users should be carefully considered

editor's note: from the perspective of safety, drawers should not be set directly around the stove. Children will pull out the drawers to make stairs and climb high, which will hurt them when they encounter the hot soup pot

IV After the tiles and ceiling are in place, retest, plot and sign the contract

after confirming that the floor tiles and wall tiles are laid, the ceiling, water heater and gas meter are installed in place, and the relevant electrical data are prepared, make an appointment with the cabinet designer to retest. After the bricklayer is completed, the designer comes to the door to retest. If there is no problem with the retest drawing, you can choose the design and color, determine the hardware, sign the contract, and officially put into production

editor's note: before signing the contract, the scheme can also be changed if there is no conflict with the water circuit. The scheme after the retest cannot be changed. General customized cabinet products, changes are charged. Therefore, before re measuring the map, you should think about all your needs

v. delivery, installation and final payment

two days before the installation date specified in the contract, the merchant should generally remind and ask the owner whether the installation is normal. If the installation is normal, the merchant will deliver and install. If there is any change, negotiate the installation date. The final payment shall be paid after installation and acceptance

editor's reminder: during the installation of cabinets, electric appliances such as range hoods, gas stoves and small kitchen treasures should be installed synchronously, and one should be in place